Carpets and Floors at yours realised the complete flooring refurbishment of the Bibra Lake gym in one weekend.

The project could only be realised in a short period of time with the coordination and planning of other trades involved and of course with the help of the team from Goodlife Heath Clubs.

Scoop of works:

  1. Uplift and disposeĀ 650 M2 of existing flooring
  2. 300 M2 of floor preparation including grinding and floor levelling
  3. 300 m2 installation of Polyflor Expona Super Plank
  4. 60 M2 Regupol E22 rubber impact tiles
  5. 290 M2 of Interface Carpet tiles
  6. Stair case with aluminium safety nosing and carpet tiles